Winter 2020 Project Updates
Some of our main projects on the shop floor for the first part of this year are a gantry robotic welding cell, robotic antenna lift, and (8) F-22 Horizontal Stabilizer Fixtures.
Some of our main projects on the shop floor for the first part of this year are a gantry robotic welding cell, robotic antenna lift, and (8) F-22 Horizontal Stabilizer Fixtures.
In 2019 we finished our automatic robotic priming, urethane dispensing, and window decking system for Seres (previously SF Motors).
Check out the news article in the Record-Courier https://www.record-courier.com/news/20190717/aurora-firm-rpgatta-to-add-20-jobs-1m-in-payroll
rpGatta is expanding again! We are increasing our engineering office by 100% with an additional 3,000 sq-ft. and our manufacturing shop space by 50% with an additional 15,000 sq-ft. Construction is scheduled to be completed by early 2020. We recently…
rpGatta recently received the official patent for a Robotic Virtual Stop Station, which automatically lifts a vehicle off the assembly line to create a fixed relationship from the moving platform with robots to the vehicle. http://www.rpgatta.com/products/patents/robotic-virtual-assembly-line-stop-station/
Our engineers recently completed the designs of a Robotic Propeller Blade Handling Cell (see rendering below), a Robotic Boroscope System (Featured Rendering Above), Leak Test Cell (see rendering below), Electric Battery Decking System, Headlamp Aiming Systems, and a Transmission Isolator…
rpGatta has been named an OEM Program Participant in the Rockwell Automation PartnerNetwork program. OEM Program participants demonstrate a commitment to offer high-quality, innovative machinery and equipment that use Rockwell Automation solutions. OEM Program members are dedicated to helping manufacturers…
The expansion came just in time. Our Engineering Department recently finished designing an Engine Cylinder Head Assembly Line (shown below) that will be 30 feet wide and a total of 63 feet in length. It consists of a pallet conveyor,…
It's the start of a new year and rpGatta recently completed expanding our 28,000 square foot building another 10,000 square feet! This addition will allow us to increase our build capacity and give us the ability to simulate even larger…
Spring is here and rpGatta is breaking ground! We are expanding our 28,000 square foot building another 10,000 square feet. This addition will allow us to increase our build capacity and give us the ability to simulate even larger assembly…